Home
  Renewable Energy  

  • The ‘In Principle Approval’ for setting up the Sector Specific Special Economic Zone for “Electronic Hardware & Software including ITES” as per the SEZ Act 2006 has been obtained from the Ministry of Commerce & Industry, Government of India.


  • Maximum ground coverage of 25% is envisaged with a thrust to greenery and the environment.


  • Standard factory buildings in the configuration of ground plus one or two upper floors. Buildings are designed in modules of 62,000 sqft per floor, which could be sub-divided into two occupants of 31,000 sqft in the ground floor. All the spaces can be contiguous for larger requirements, depending upon the customer requirement.


  • Common infrastructure in a phased manner like Customs office; Security guard room; Information centre; ATM; Crèche; Medical centre; Truck terminal with weigh bridge; Bus bays; 24/7 Security and surveillance system with CCTV for the campus exteriors; Water storage, treatment and distribution system; Sewage treatment system; Fire reserve and yard hydrant system; Extensive landscaping with water body; Rain water harvesting system; Telecommunication ducts; 110/11 KV substation by TNEB.


  • Internal finishing and utilities need to be provided by the lessee after obtaining the design approval from our nominated panel of project architects and approved service consultants.


  • The facility will be a “Zero Discharge” park. Sewage or effluent will be treated at the common sewage treatment plant.


  • Waste management solution (collection, storage, transport and disposal for all non-hazardous and hazardous waste, including e-waste) in the Industrial park will comply with the Indian environmental laws as well as the specific requirements of the Tamil Nadu Pollution Control Board (TNPCB) and/or any other environmental authority.


UTILITIES
Power
  • Through Tamil Nadu Electricity Board network with on-site substation.


  • Additional DG back-up will have to be arranged by the individual units.

Water
  • Abundant ground water through dedicated water network and adequate water storage.


  • Treated water recycled for landscaping and flushing activities.


  • Rainwater harvesting methods to maximize ground water recharging have been built in right from the inception of the project.

Roads / Landscaping
  • Roads will be adequately wide for industrial activities


  • Central median landscaping as well as sidewalk and curbside landscaping

Communication
  • Top line telecom facilities and unlimited bandwidth through optic fiber-cable network of reputed service providers.

Security
  • 24 x 7 security for common areas

Sewage Treatment
  • Common sewage treatment plant will be provided in a place designated by the local authorities.
  SEZ OverviewVTPPL SEZ Chennai Occupancy ModelProject HighlightsSEZ Virtual Tour